Odds & ends

Exactly as the title says…this is an odds & ends post! Lots of material has been delivered for the animal shelter (which will be worked on by our visiting group in August!) A bathroom sink has been installed.  Piping, doors and shelves on the base and...

More water stuff

Another stage in the water process at C4KK is moving a 4000 liter tank, which was being used for all the water needs in the home and on the compound, was finally moved to it’s rightful place…out in the shamba. Here it is before being moved.  This is where...

Different point of view

Well, it’s certainly not the Different Pointe of View (my Phoenix friends may know what I’m talking about!), but no matter it is an interesting view from the top of the water tank stand. I admit it took me awhile to actually climb up there and I stayed...

Slower posting…sorry

C4KK still does not have electricity and that means my computer isn’t turned on all day and that means I don’t get my stuff done during the day.  By the time we get home, usually around 6:30-7, make dinner (no drive-thru’s to make this easier) and...

Still no power but we continue on!

Water will not be stopped!  Without electricity we simply use the generator to continue piping water throughout the compound. Inside the home there are a few adjustments yet to make but then water will be flowing to the kitchen and the choo area (sink to wash hands...

Pin It on Pinterest