upper-floor-1-21-(2)

They are starting construction on the roof, most of the windows are in and the water tank (that’s the black tank in the foreground) is waiting for its spot to rest (far upper left corner is where it will sit).  We are excited to watch the progress of this project and to dream of the joy it will bring the kids (to be used for a play and study area) and the community (Bible studies can be held here and church services).

If you would like more information about this project or to help assist with the construction costs please visit the “Stack the Stones” page on our website.  Thank you for your prayerful consideration.

Pin It on Pinterest